Yodeler – Holiday Valley, NY

This was the last true CTEC lift built at Holiday Valley before the manufacturer merged with Doppelmayr.
Loading area and unique motor room enclosure.
Bottom terminal.
Steep lift line.
The top terminal.
Breakover towers.

4 thoughts on “Yodeler – Holiday Valley, NY

  1. reaperskier August 20, 2020 / 6:44 pm

    The motor room enclosure on this lift was also used on the V-Hill Quad at Craigleith Ski Club

    Like

  2. Northeast Chairlifts January 20, 2021 / 8:08 pm

    This lift was known as quite difficult to load since the chair spacing was always extremely close. Despite a slow operating speed, you still had to be quick!

    Like

  3. Will December 12, 2021 / 9:15 am

    I love the motor room design on this one. Any idea if it sold? I’m sure a less developed mtn out west would love something like this.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s