0 – Devil’s Head, WI

This lift replaced two older Halls, hence the wide clearing.
Doppelmayr Tristar drive terminal.
View riding up.
Tower 4 of 8.
Looking back down.
The upper part of the lift line is very low angle.
Arriving at the summit.
Return bullwheel.
Unloading area and lift shack.
Upper part of the lift line.
Side view of the top station.
Side view of the bottom station.
View up the line.
Loading area.
Tower 1.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s