1 – Mont Gleason, QC

In 2019, Doppelmayr replaced two T-Bars with this Alpen-Star quad.
The bottom terminal has carpet loading.
Riding up the line.
Middle part of the ride up.
View back down the line.
Upper part of the lift line.
View back down.
Nearing the top terminal.
Arriving at the unload point.
Top shack and unloading ramp.
Upper station overview.
Some of the lifting frames are heavier duty due to higher loads.
View up at tower 9.
Lower part of the line.
View down.
T3.
Tower 1 near the bottom terminal.
Drive station with tensioning.
Sheaves attached to the bottom station.
Side view of a heavily loaded tower.
Lift overview.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s