This lift runs parallel to Lift 2 but is shorter.Borvig snowflake bullwheel.Looking down the line.Tower 6 with a newer lifting frame.The Partek chairs are not original.Towers 1 and 2.Lower station with a portal tower right out of the gate.Loading area and counterweight.
The upper terminal appears to have been moved downhill sometime around 2001 or 2002, shortening the lift from its original stats (currently under 1000 ft long). I’m not sure when the Partek carriers were installed, but likely within the same few years as Lift 1.
The upper terminal appears to have been moved downhill sometime around 2001 or 2002, shortening the lift from its original stats (currently under 1000 ft long). I’m not sure when the Partek carriers were installed, but likely within the same few years as Lift 1.
LikeLike