Ridge #5 – Massanutten, VA

This is the second Doppelmayr Eco drive for Massanutten.
Bottom terminal loading area.
Tower 1.
There’s a very tall mid-station unload.
View down below the mid-station.
Split and half tower at the mid.
Another view down the line.
Looking up from the mid-station.
Lift line overview.
Top terminal with tensioning.
Unloading ramp and operator house.
Line overview.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s