’88 Express – Canada Olympic Park, AB

This short detachable replaced a fixed-grip quad in 2012.
Bottom drive terminal and operator house.
Note some chairs have been removed.
The top terminal was built on a man made hill to extend COP’s vertical.
Uni-G terminal skin.
Towers 1 and 2.
Side view of the drive station.
Upper half of the lift.
Combo assemblies on tower 7.
The breakover.
Arriving up top.
Unloading area and CTEC-style operator house.
Top station overview.
View down the lift line.
Lower section of the lift.
Upper lift line.
Another look at the line.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.