This lift is one of two triples Thiokol built at Snow Trails.The loading area.Tower 1.Riding up the line.Unique tower design.The top bullwheel.View from the summit.Middle part of the lift line.This lift received new Skytrac tower heads in 2021 and a hydraulic tension system in 2023.Last tower with new Skytrac equipment.View up the upgraded lift line.Skytrac hold down tower head.
Since the photos were taken, the tower heads and sheave trains were replaced by SkyTrac in 2021 to match what was done on the Mount Mansfield triple. It operates on an as-needed basis when crowds are higher, but was running when I visited recently.
Since the photos were taken, the tower heads and sheave trains were replaced by SkyTrac in 2021 to match what was done on the Mount Mansfield triple. It operates on an as-needed basis when crowds are higher, but was running when I visited recently.
LikeLike