Barrows – Howelsen Hill, CO Lower station from above. Towers 6-9. This tower slid downhill in a landslide and had to be re-set. Unloading area during summer operations. Heron-Poma return bullwheel. Lower lift line. Counterweight and drive bullwheel. Share this:EmailTwitterFacebookLike this:Like Loading...
Jonathan February 15, 2018 / 9:07 am If this lift gets replaced in 2019, will the chairs be sold? LikeLike
Ryan December 7, 2019 / 10:24 pm I’m going to be sad when this lift gets replaced. it’s had a lot of problems, but I really like the old Heron Poma lifts. LikeLike
Myles Svec February 7, 2021 / 6:23 pm According to Colorado ski history there were 2 chairlifts. http://www.coloradoskihistory.com/lost/steamboatlake.html LikeLike
If this lift gets replaced in 2019, will the chairs be sold?
LikeLike
I’m going to be sad when this lift gets replaced. it’s had a lot of problems, but I really like the old Heron Poma lifts.
LikeLike
What lift was this at Steamboat Lake?
LikeLike
It was their only chairlift.
LikeLike
According to Colorado ski history there were 2 chairlifts.
http://www.coloradoskihistory.com/lost/steamboatlake.html
LikeLike