Blackcomb Gondola Stage 1 – Whistler Blackcomb, BC

A two stage gondola replaced the two earliest detachable quads on Blackcomb in 2018.
The Blackcomb Gondola can be split into two different sections depending on the weather.
Both sections have some very tall towers.
Upper part of the lift line.
View down towards Blackcomb Daylodge.
Towers below the Excalibur Gondola crossing.
Another view down the lift line.
Looking up the lift line.
The entire lower section lift line.
Close cabin spacing.
Cabins unload on one side of the terminal and load on the other with no loading on the turnaround.
Uphill loading zone.
Side view of the return terminal.
View up from the maze area.
Cabins speed up in the turnarounds to avoid colliding.
Cabins at the downhill end of the drive station.
Cabins at towers 20-21.
View down from the top breakover.
Another view down the lift line.
Side view of towers 20-21.
The middle station is higher lower than the old Wizard/Solar Coaster split.
View down the line.
Middle part of the lift.
A cabin passes a combo assembly.
Relatively flat part of the lift line.
Gondolas crossing gondolas.
View down from just below the Excalibur crossing.
View up the steeper part of the line.
Lift overview.
Maze area and return station.
Long Uni-G station.
Lower station overview.
Unloading for downloaders.
Advertisements

10 thoughts on “Blackcomb Gondola Stage 1 – Whistler Blackcomb, BC

  1. Tyler February 10, 2019 / 8:42 pm

    Did they modify the Excalibur towers at the crossover to go under instead of over the new gondola, or does it cross in a different spot? Look at the 3rd pic on the Wizard page – now it’s a compression tower after the crossover

    Like

    • AvocadoAndy February 10, 2019 / 11:14 pm

      Yeah, I believe they shortened the tower as well. Those towers were originally specifically designed taller so they could cross over wizard, they had to shorten them so that the Blackcomb gondola could pass over.

      Like

  2. Doppelmayr FTW February 11, 2019 / 11:22 am

    Those are some beefy terminals!

    Liked by 2 people

  3. Paul Hothersall February 11, 2019 / 7:54 pm

    Also note this is with version 2 of the outside ski/board racks.

    We had a significant number of “problems” with the original fit resulting in non wind related equipment departures over open runs and some obviously unhappy guests with lost/damaged equipment.

    Like

    • Peter Landsman February 11, 2019 / 8:00 pm

      As of Saturday, all riders were required to bring equipment inside the cabins.

      Like

      • Doppelmayr FTW February 11, 2019 / 8:08 pm

        The racks dont hold skis well?

        Like

        • Peter Landsman February 13, 2019 / 4:35 pm

          I’m not sure what the reason is. The racks looked nice with a variety of sizes for different types of equipment. It was windy when I was there but the signs about taking everything inside seemed to be permanent.

          The lack of logos on the cabins is also a mystery to me. The concept art had them.

          Vail went with leather upholstered seats, which are awesome.

          Like

        • Doppelmayr FTW February 13, 2019 / 5:49 pm

          strange, could it have something to do with the height of the towers?

          Like

        • AvocadoAndy February 13, 2019 / 7:17 pm

          I did see that one of the cabins of the stage 2 pictures has the logo. Maybe they skipped putting the stickers on so the delay on the gondola’s opening wouldn’t be any longer than it needed to be.

          Like

        • Peter Landsman February 13, 2019 / 7:31 pm

          Normally the decals are applied at the factory. Here is a photo of the racks:

          Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s