Lift line view.Lower station with counterweight tension system.Doppelmayr tower head #4.Looking back down the line.Empty lift line.Arriving up top.Unloading area.Breakover towers.Lower section of the line.Upper lift line.Side view of the base terminal.
Elk should go detach, the quad could be moved over to the Fish bowl (the one beside Cedar). They should prioritize building a HSQ in Currie Bowl, having to ski down to the base and ride two lifts is PAINFUL for repeat laps.
The bounce this lift has when it slows down is incredible. (4:07 – 4:34 for the smaller bounce, 5:54 – 6:23 for the larger bounce)
LikeLiked by 1 person
Indeed !
LikeLike
But is is sooooo slooooww…
LikeLike
Could be high speed… Elk and Cedar Bowl first!
LikeLike
Elk should go detach, the quad could be moved over to the Fish bowl (the one beside Cedar). They should prioritize building a HSQ in Currie Bowl, having to ski down to the base and ride two lifts is PAINFUL for repeat laps.
LikeLike
This lift is way at the back of the upgrade list, it’s never crowded.
LikeLike
Seeing the announcements today, you were spot on with the lift upgrades’s priority.
LikeLike
The chair was broken December 2022. Skied out of Lizard Bowl via Cedar Bowl every time.
LikeLike
You mean out of Cedar Bowl via Lizard Bowl ;)
Too bad it broke down, Haul Back was also down on January 15-16 last year.
LikeLike