The Cascade Basin expansion opened in 2013 with new terrain on the backside.This triple chair was relocated from another mountain with lots of upgrades.Last tower and the top terminal.View down the lift line.Upper section of the lift.Lower lift line.View up from the base.Portal tower 1.Another view of the first tower.Loading area.Green Mountain control system.Lower station overview.
Originally a 1986 Von Roll-Habegger Triple called Exhibition at Osler Bluff Ski Club, Ontario. Hydraulic tensioning added by Skytrac upon installation at Pat’s Peak, as was the motor room by Partek.
This lift was relocated from Osler Bluff Ski Club, Ontario.
LikeLike
Originally a 1986 Von Roll-Habegger Triple called Exhibition at Osler Bluff Ski Club, Ontario. Hydraulic tensioning added by Skytrac upon installation at Pat’s Peak, as was the motor room by Partek.
LikeLike
Why did Pats use a Partek motor room instead of a Skytrac Monarch or whatever was already on the machine?
LikeLike
Does anyone have a picture of this at Osler Bluff?
LikeLike