Chair 1 – Pine Knob, MI

This lift dates to the early Doppelmayr CTEC merger era.
Sprint drive terminal next to the base lodge.
Arriving up top.
Return bullwheel.
Another look at the top station.
View down the short lift line.
Tower 1 labelled as 2.
Upper line.
Loading area.
Side view of the drive terminal with hydraulic tensioning.
Doppelmayr Worldbook entry.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s