Chair 2 – Sandia Peak, NM

This was the second chairlift built at Sandia and the first Riblet.
Top terminal with vault drive.
Another view of the top station.
Looking down the line.
Unloading before the top bullwheel.
Middle section of the lift line.
View up the lift.
Lift line overview.
Lower terminal and operator house.
Lower bullwheel with tensioning.
View up from the load point.
Side view of the bottom station.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s