This steep lift follows one of the two original lift lines at Mt. Baldy from 1952.Simple Mueller return bullwheel up top.View down the lift line.The towers are Ringer but the rest of the lift is Mueller.Drive station outside controls.The bottom terminal with loading at T1.View up from the drive/tension unit.Side view of the drive and counterweight.Bottom terminal and towers 1-2.Lift line seen from Chair 2.This lift received new Partek chairs in 2024.New chairs on the line.
New Mueller carriers with safety bars are being installed this summer per SSJ
LikeLike
Never expect anything to get done within ten years of it being announced at Mt. Baldy.
LikeLike
New carriers have been installed.
https://www.instagram.com/reel/DF5WmDCpzna/?igsh=aHllcTZwNmZzeHR5
LikeLike
Cool! They look like Parteks.
LikeLike
still no safety bars. I wish these seats has cushions and foot rest too.
LikeLike