Chair 3 – Mt. Baldy, CA

This steep lift follows one of the two original lift lines at Mt. Baldy from 1952.
Simple Mueller return bullwheel up top.
View down the lift line.
The towers are Ringer but the rest of the lift is Mueller.
Drive station outside controls.
The bottom terminal with loading at T1.
View up from the drive/tension unit.
Side view of the drive and counterweight.
Bottom terminal and towers 1-2.
Lift line seen from Chair 2.
This lift received new Partek chairs in 2024.
New chairs on the line.

5 thoughts on “Chair 3 – Mt. Baldy, CA

  1. RandyM's avatar RandyM May 28, 2023 / 7:14 am

    New Mueller carriers with safety bars are being installed this summer per SSJ

    Like

  2. Lachlan's avatar Lachlan March 18, 2024 / 12:40 pm

    still no safety bars. I wish these seats has cushions and foot rest too.

    Like

Leave a reply to Peter Landsman Cancel reply