Lower station next to Canyon Lodge.Yan tension terminal.Portal sheaves.Leaving the base.Riding up the line.View back down.Fixed drive terminal up top.The entire lift.Top station overview.Lift line with Yan chairs.First few towers.Tension carriage.
Ch 8 seems to run slower than most, but is a sneaky great lift on a powder day or when there’s weather above tree line (i.e. often). Will be sad to see it go if the most recent edition of the Mammoth Master Plan is fully implemented.
Are those Doppelmayr grips?
LikeLike
Looks like it.
LikeLike
Looks like Yan, but with Doppelmayr grips and Doppelmayr safety bars.
LikeLike
this lift was made in 2001 I saw this was still a double lift in the 2001 trail map
LikeLike
It appears that the chairs were only components that were replaced in 2001. Do you happen to know where the triple chairs came from?
LikeLike
Ch 8 seems to run slower than most, but is a sneaky great lift on a powder day or when there’s weather above tree line (i.e. often). Will be sad to see it go if the most recent edition of the Mammoth Master Plan is fully implemented.
LikeLike
LikeLike