Christmas – Sun Valley, ID

baldy 027
Bottom terminal with Yan-Doppelmayr conversion.
baldy 049
Lower station.
baldy 089
Top terminal.
baldy 096
Another view of the top.
baldy 163
Bottom terminal and lift line.
IMG_0449
Riding in the summer.
IMG_0454
Looking back towards the Roundhouse.
IMG_0461
Arriving at the summit.
The entire lift seen from the Roundhouse.
Lower station with small parking rail.
Top station next to sister ship Lookout.
Terminal without underskin.
The lower station next to the Roundhouse Gondola summit.
Un-retrofitted Yan drive motor.
This lift received Doppelmayr EJ chairs for the 2023-24 season.

21 thoughts on “Christmas – Sun Valley, ID

  1. Donald Reif's avatar Donald Reif August 20, 2019 / 1:50 pm

    I wonder why this one and Frenchman’s kept their teardrop chairs instead of getting EJ chairs when Doppelmayr refurbished them.

    Like

  2. Mike Landes's avatar Mike Landes August 17, 2020 / 10:14 am

    The Doppelmayr hangers are longer, changing chairs would have required excavation work.

    Liked by 1 person

    • pbropetech's avatar pbropetech February 12, 2022 / 8:42 am

      No, these hangers are custom-built. The lifts that did a full carrier swap also had custom hangers to fit into the converted terminals. There should be no need to excavate anything.

      Like

  3. pnwrider's avatar pnwrider September 23, 2021 / 11:11 am

    According to Ecosign’s Sun Valley master development plan, this lift will be replaced with an extension of the Roundhouse Gondola, going to the summit. Hopefully when they extend the Roundhouse Gondola, additional capacity will be added, as the current gondola only moves 1,800 people per hour despite the useful location of it.

    Then there will be another gondola connecting the River Run base to the base of Dollar Mountain, which is something I very much look forward to.

    Like

    • skitheeast's avatar skitheeast October 25, 2022 / 9:20 am

      This is a fantastic idea. A gondola connection to Lookout would be useful for non-skier utilization and the existing Christmas layout is awkward, as only the upper portion of the bowl can be lapped without needing to go down to Broadway. Sun Valley’s GM mentioned Christmas as the next replacement post-Challenger/Greyhawk and I really hope they realign the lift to start down by Seattle Ridge, opening up the existing alignment for a future Roundhouse Stage II.

      Liked by 1 person

      • pnwrider's avatar pnwrider December 17, 2022 / 10:10 pm

        I haven’t even thought of that, that’s a great idea, making Christmas go down further towards Seattle Ridge! Would make a lot more terrain lappable as you said!

        Like

  4. Myles Svec's avatar Myles Svec September 23, 2021 / 2:03 pm

    How does this lift fair to wind? Much of the liftline looks very exposed.

    Like

    • JerryGarciasBriefcase's avatar JerryGarciasBriefcase January 1, 2025 / 5:41 pm

      My home mountain for the last 5 winters and live in Ketchum. You’d think wind would be an issue up there but it’s really not. It’s pretty rare for mountain operations to be impacted by weather, other than late starts after heavy snow and Mayday being closed for avalanche mitigation after a big storm. I think there was a day or two last winter where the only lifts open were gondola and below (flying squirrel, frenchman’s, RR and the gondola were the only lifts spinning… I think).

      Like

  5. Donald Reif's avatar Donald Reif February 4, 2024 / 11:03 am

    Video of the lift with EJ chairs.

    Like

  6. Skier's avatar Skier April 3, 2024 / 7:13 pm

    What’s up with the large chains in the top terminal on the 3rd to last picture. Is the drive bullwheel in this terminal on a moveable carriage with its position set by the chains, but not used for active tensioning?

    Like

    • Ryan's avatar Ryan April 3, 2024 / 11:38 pm

      I’m pretty sure it has to be active tensioning and not manual. I wonder if instead of cable tensioning chain tensioning was used by Yan and they kept this with the upgrades that Doppie did? 

      Like

      • pbropetech's avatar pbropetech April 4, 2024 / 10:17 am

        I think you’re both correct, and this is a passive-tension carriage. Ryan- definitely. With the sheer scale of all the required retrofits it wouldn’t surprise me at all if they kept this instead of adopting Doppelmayr’s equipment as it meant one less thing to change. It appears that with the chains it can be repositioned as needed for rope stretch. I don’t see any mechanism in the photo for doing that, so maybe they have a size XL chain hoist that we can’t see in the shadow?

        Yan also used this same chain as a safety in their active-tension systems.

        Like

        • Skier's avatar Skier April 4, 2024 / 1:40 pm

          The bottom terminal is definitely hydraulically tensioned and you can see the safety chains dangling under the terminal. I thought it was an interesting setup, it’s almost a double tension terminal setup, but not quite. The best way to describe it may be 1.5 terminal tension lol.

          Like

        • vons3's avatar vons3 April 4, 2024 / 7:23 pm

          From Donald’s video it looks like there is a multi part pulley setup mounted on the column guessing the other half is on the carriage so with a right wire rope some rope clips and a dozer or cat the carriage can be moved.

          Like

Leave a reply to pbropetech Cancel reply