Comet Express – Bristol Mountain, NY

This was the first detachable lift built at Bristol in 1999.
Garaventa CTEC station.
Loading area.
The bottom terminal.
View up the relatively steep line.
Middle section of the lift.
Tower head.
Nearing the summit.
Arriving at the drive.
Unloading ramp.
View down the line.
Hold down assemblies on tower 7.
Tower 4.
Upper terminal overview.

2 thoughts on “Comet Express – Bristol Mountain, NY

  1. Collin Parsons January 16, 2021 / 8:02 pm

    This lift replaced the Summit Triple on a new alignment up the Comet trail. I believe this was done to give it easier access to the Morningstar expansion that was built the next year. The Summit Triple was relocated to the looker’s right side of the Rocket trail to replace the North Double, a Carlevaro and Savio lift that was original to the mountain. Its twin, the South Double on the lookers left side of the Rocket trail, was replaced by the Summit Triple in 1984.

    Like

  2. Northeast Chairlifts January 20, 2021 / 7:39 pm

    Cool to see you got out to my area! I’ve videoed all these lifts in the past years

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s