This was the first six pack in Wisconsin and services the heart of Granite Peak.Bottom terminal set up for summer operations.Leitner-Poma Omega station with wood cladding.Bottom terminal with integrated sheave assemblies.Tower 2.The first few towers.Looking down an empty line.View up at tower 4.Drive terminal.Looking down from the top.Side view of the top station.Summit terminal.