Dreamer #3 – 49° North, WA

For the 2026-27 season 49 North replaced an SLI double beginner lift with a Doppelmayr quad.
The new lift starts near the older Grubstake double.
The lift follows a completely new alignment crossing the former one.
Tower 1 with the old Lift 3 terminal in the background.
View up the middle part of the line.
Lower lift line.
View down near the top of the old lift.
Fixed Alpenstar drive up top.
Upper station overview.
Drive terminal and unloading area.
View from the summit.
Drive bullwheel.
Outside operator controls at the drive.
EJ chair with bar but no footrests.
View down the line at tower 6.
Towers 6 and 7 with the old lift’s terminal mast visible.
View down at the loading station.

Leave a comment