East Peak Express – Windham Mountain, NY

Doppelmayr CTEC built this detachable to replace a triple chair on East Peak in 2006.
View down at tower 10.
The Uni-GS top terminal.
Unloading area.
Top terminal overview.
View down from the top terminal.
Lower section of the lift line.
Side view of the bottom drive terminal.
Loading used to be perpendicular to the terminal but as of 2018, it is in line.
Lift line seen from the base area.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s