This lift was built in 1992 but I believe it was moved sometime before the 2002 Olympics.CTEC Sprint-model base terminal.This lift operates in the summer for zip lines access, tubing and hiking.Leaving the bottom terminal.There are only two towers on this lift.The first standalone tower.Top terminal.Upper part of the short lift line.