Freeway – Whiteface, NY

The steep Freeway double services terrain along the lower gondola line.
Drive-tension combo station.
Portal tower 1.
The lift seen from the parking lot.
Loading area and cables to the counterweight.
View up from tower 1.
Side view of a mid unload point.
View down from unload ramp one.
Unique Hall tower.
View up from the mid.
Another section of the line above the mid.
Top unload ramp.
The bullwheel with Mountain Run in the background.
Looking down from the top.
Breakover towers.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s