Gad 2 – Snowbird, UT

IMG_7091
Upper section of the line.
IMG_7095
Tower 14.
IMG_7099
Arriving at the top.
IMG_7101
Doppelmayr Uni-G station.
IMG_7104
View down an empty line.
IMG_7125
Depression towers 11-12.
The bottom terminal.
Lift overview.
View up the undulating lift line.
Lower station area.
Tower 3.
Lower lift line.
View down the line in summer.
Tower 9.
Top unloading area.
Another view of the upper station.
View from the top.
Upper station seen from Little Cloud.

5 thoughts on “Gad 2 – Snowbird, UT

  1. Cooper April 7, 2018 / 8:35 am

    Third to last picture the bottom station isn’t the drive. Unless the spreadsheet is wrong.

    Like

    • Alex April 14, 2020 / 6:39 am

      the drive is up top on all high speed quads at snowbird except baldy

      Like

  2. Alex April 14, 2020 / 6:39 am

    Gad 2 has 63 chairs

    Like

  3. Alex Kennedy March 15, 2021 / 1:09 pm

    Anyone know why this lift and Peruvian run much faster than all of the Hsqs at Snowbird? On a typical day you’ll find Gadzoom running at about 850fpm while Gad 2 and Peruvian will be running about 935fpm.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s