Counterweight tensioning.Approaching the top station.Top terminal.Looking up the lift line.Lower station overview.Lift loading area.View down from the summit.
Pretty sure C7 Gold Hills was relocated from Bullion Basin in the summer of 1983. I started skiing Crystal during the 83/84 season and it was already in place. The next summer, 1984, C8 Meadow (now Discovery) and C9 Rendezvous (now Cascade at Big Sky) were installed.
Pretty sure C7 Gold Hills was relocated from Bullion Basin in the summer of 1983. I started skiing Crystal during the 83/84 season and it was already in place. The next summer, 1984, C8 Meadow (now Discovery) and C9 Rendezvous (now Cascade at Big Sky) were installed.
LikeLike
why does thiokol look so much lake hall and CTEC ski lifts
LikeLike
Because Thiokol became CTEC as for the hall part the chairs are the only part that resembles somewhat hall
LikeLike
Why is it always closed?
LikeLike