Hellroaring #8 – Whitefish Mountain, MT

IMG_9616
Top station and upper portion of the lift line.
IMG_9617
CTEC motor room and unload ramp.
IMG_9618
Lift line view.
IMG_9619
Tower 17 and the top station.
IMG_9623
View down the line.
IMG_9624
View up the line.
IMG_9628
Looking down to the return station.
Since there is no way out from the bottom of this other than riding it, a special carrier was built to carry patrol toboggans.
View up from the bottom.
Tall tower 2.
Bottom terminal with tensioning.
Loading area.
Breakover towers.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s