L’Éclipse – Stoneham, QC

In 2017, this lift replaced three different fixed grip lifts in one fell swoop.
The lift line is more than 4,000 feet long.
Loading area.
Alpen-Star drive-tension terminal.
Riding up the line.
Splice tower.
View towards the village.
Another splice tower.
View back down the line.
Nearing the summit.
Arriving at the top bullwheel.
Upper station overview.
Fixed top bullwheel.
Upper part of the lift line.
Middle lift line.
A tower with a combo assembly on one side, hold down on the other.
View down at the steepest part of the line.
The first few towers.
Drive station.
Note the loading carpet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s