Does anyone know what’s up with the recently cut (what appears to be) lift line from the bend in point six road to near the top of Grizzly? It looks to be a way to connect Snow Park and LaVelle Creek, while also being a new way to lap a bunch of terrain that currently requires 2 slow lifts and a lot of distance, or cutting half the run short to make it back to LaVelle.
It doesn’t appear on any trail maps or announcements, so wondering if its a possibility in the near future. It is in the MDP published in 2004-2006, and the new line was cut in Sept. 2025. Despite the age of the plan, Snow Park and Transporter were installed as they were shown in the MDP.
142 towers for Snow Park?
LikeLiked by 1 person
Looks like it has 22 towers based on the number on the last tower.
LikeLike
I bet it just has 142 chairs and 22 towers :)
LikeLiked by 1 person
Especially when the spreadsheet says 22 chairs. There must not be any infill towers…
LikeLiked by 1 person
Does anyone know what’s up with the recently cut (what appears to be) lift line from the bend in point six road to near the top of Grizzly? It looks to be a way to connect Snow Park and LaVelle Creek, while also being a new way to lap a bunch of terrain that currently requires 2 slow lifts and a lot of distance, or cutting half the run short to make it back to LaVelle.
It doesn’t appear on any trail maps or announcements, so wondering if its a possibility in the near future. It is in the MDP published in 2004-2006, and the new line was cut in Sept. 2025. Despite the age of the plan, Snow Park and Transporter were installed as they were shown in the MDP.
LikeLike