Mountain Top – Berkshire East, MA

This Poma Delta triple is one of two main base to summit lifts here.
The equipment came used from Ski Rio, New Mexico.
Loading area and lift shack.
The top terminal.
Last tower at the summit.
Looking down the lift line.
View up from the base area.

5 thoughts on “Mountain Top – Berkshire East, MA

  1. Porter December 10, 2019 / 12:28 pm

    I have never seen Poma ring towers before. The ring tower was the last tower.

    Like

  2. Calvin March 6, 2021 / 1:13 am

    Why did Poma of this eara (and others like most Halls) use smaller sheaves for depression and larger sheaves for support?

    Like

    • pbropetech March 31, 2021 / 9:16 am

      I’ve wondered that for years, and I work on a twin to this one.

      Like

      • vons3 February 20, 2023 / 2:32 pm

        I would guess ride quality, they also tended to use more sheaves than if they had been using the standard size ones, allowing a smaller deflection per sheave. I would guess this lift would have used a 10 or 12 sheave assembly if the standard size was used with the smaller sheaves it’s a 16 sheave assembly.

        Like