For the 2023-24 season, Mount Southington replaced a Hall double with a Partek triple.Loading area.The drive terminal sits in about the same spot as the old double but takes up less space.The top terminal.Unloading area.Fixed return up top.Tower 4.The entire lift line with four towers.Lower lift line.Drive-tension station.Snowflake style bullwheel.Galvanized chair from Partek.View from the summit.
On 2023 New Lifts, this link takes you to a different website.
LikeLiked by 1 person
Looks like it has been fixed now.
LikeLike