Papoose – Teton Pass, MT

SLI drive-tension terminal in the base area.
Integrated depression sheave assemblies.
Looking uphill from the bottom terminal.
Middle part of the lift line, below the mid-station.
Just below the mid-unload.
View down the lower half.
Upper section of the line.
Mid-station.
First unload ramp.
View down above the mid.
Near the summit.
Looking down the lift line.
Breakover towers 17 and 18.
T18.
Top unload ramp and shack.
Entire lift line.
Fixed top bullwheel.
Towers 1-3.
All low voltage controls have been upgraded to the EMAX system.
Advertisements