Peak – Pats Peak, NH

Skytrac relocated this triple chair from Acutney, VT to Pats Peak in 2017.
The new lift has a loading carpet, hydraulic tensioning and other upgrades.
View down the lift line.
Looking down at tower 14.
Tower 15.
The CTEC Orion top station.
Lift line overview.
The first few towers in the base area.
Enterprise return terminal.

12 thoughts on “Peak – Pats Peak, NH

  1. Carson's avatar Carson October 28, 2018 / 6:17 pm

    Did they reuse the towers when it was at Ascutney or did skytrac build new ones

    Like

    • Sam Altavilla's avatar Sam A. January 27, 2019 / 9:53 am

      The tower tubes may be original, however the lifting frames were SkyTrac.

      Like

  2. Tyler Baroody's avatar Tyler Baroody November 27, 2022 / 5:51 pm

    Why does this lift have two depression towers where the old Mueller had one? Is it in place of compression sheaves?

    Like

    • Matthew Harvey's avatar Matthew Harvey July 31, 2026 / 5:10 am

      The goal at Pats was to keep the lift as low to the ground as possible while still allowing ski under clearance. Due to it’s profile, it required “combination” sheave trains on the towers in the flatter areas and a duel depress setup where the vertical increases. The other option was to have a single depress over 45′ tall. That was not desirable.

      Like

  3. liftnerd's avatar liftnerd September 29, 2023 / 9:48 am

    This is perhaps one of the most photogenic CTECs ever built.

    Liked by 1 person

  4. liftnerd's avatar liftnerd September 30, 2023 / 9:30 am

    Why did SkyTrac switch out the sheaves during the refurbishment? While at Ascutney, this machine had spoked CTEC sheaves. Parts availibility?

    Like

      • Calvin's avatar Calvin February 26, 2024 / 10:23 am

        No those are early vintage CTEC towers.

        Liked by 1 person

        • vons3's avatar vons3 February 26, 2024 / 12:11 pm

          Pats ordered new tower heads with the re install and I think new sheaves with sealed bearings too. Around the same time that this lift was done Skytrac did #5 at Whitefish and learned that retrofitting lifting frames and walkways onto the old CTEC slip cap style crossarm was not cost effective hence the preponderance of towerhead retrofits since.

          Liked by 1 person

        • liftnerd's avatar liftnerd February 27, 2024 / 6:27 pm

          Look at the footings and the diameter.

          Like

      • vons3's avatar vons3 February 27, 2024 / 8:04 pm

        It wasn’t, CTEC used the Hall square style base plates early on (Jan Leonard started with Hall). CTEC switched in the early 90s to the round base plates with gussets, none of the docs I saw during the relocate noted anything Hall about the lift.

        Liked by 1 person

  5. carletongebhardt's avatar carletongebhardt February 17, 2025 / 7:51 pm

    This lift had to be evacuated today due to a deropement today. There seem to be conflicting reports as to whether it was wind related.

    Like

Leave a comment