This lift was built by Blue Mountain Lifts in 1989 and significantly upgraded by Leitner-Poma in 2007.The first few towers.Base area.Middle part of the lift line.Tower 3.Upper part of the lift line.View down the mountain.Tower 9 and the top terminal.Snowflake top bullwheel.Blue Mountain tower and Leitner-Poma chairs.Breakover towers.Lift line overview.View from the summit.Alpha drive terminal.View up from the base area.Lift overview.Another view of the entire lift.Upper lift line closeup.
The terminal appears to have been added later than 2007, because it has the new LPA logo, which wasn’t introduced until 2010.
LikeLike
Upon further review, I think the upgrade was in 2011.
LikeLike
Interestingly however, the chairs have the older (pre-2010) logo.
LikeLike
The chairs could be from 2007
LikeLike