Powder – Powder King, BC

This lift was one of two installed in 1984 when Azu Ski Village became Powder King.
This lift runs on diesel fuel 100 percent of the time.
Upper station overview.
View down near the summit.
About half way up, 36 power lines cross over the lift line.
Lower lift line.
View up the line.
Lift line overview.
Side view of the tension return station in the base area.
Loading area.
View riding up the line.
Doppelmayr tower head.
Riding under the power lines.
Upper lift line.
View back down.
Tower 13.
T15.
Side view of the top terminal.
Lift overview.

One thought on “Powder – Powder King, BC

  1. kiroro236 March 10, 2023 / 5:07 pm

    how do you refuel this lift, wheres the fuel tank, is it like fernies Polar Peak Chair way of refueling

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s