One of two Mueller doubles at MRG, Practice Slope opened in 1972.Lower terminal building.This location has the drive and tensioning systems.View up the line with newer lifting frames having been added.Upper part of the line.Top bullwheel and last tower.Unloading area.
well… those lifting frames are brand new this summer. They weren’t there when I filmed this lift this past December
LikeLiked by 1 person
Apparently, the lifting frames were added to make maintenance easier as well as a new variable speed drive motor. https://www.preservemadriver.com/news/2018/9/23/new-lifting-frames-installed-on-the-practice-slope
LikeLike
I wonder who manufactured the lifting frames?
LikeLike
Looks like Doppelmayr did.
LikeLike
Yeah I can agree it looks doppelmayr did
LikeLike