The main lift at Sasquatch for now is a 1977 Doppelmayr triple.The bottom station has counterweight tensioning.View up the lift line.Depression sheaves.Doppelmayr triple chairs and a tower with lifting frame.The top terminal with an overhead drive.Unloading at the drive bullwheel.Tower 16.Breakover towers.A triple chair with slats and Mt. Baker in the background.View down the lift line.Looking up from the mid point of the line.Lower line.Doppelmayr didn’t supply lifting frames for depress towers in 1977.View up the line.The first few towers.Side view of the lower station.Counterweight and support.Lift overview.
The height adjustable tension station is interesting
LikeLike
I have a feeling, this lift will be replaced with a used Dopp High speed quad, originally planned for the replacement of skyline.
LikeLike