Screaming Eagle – Grouse Mountain, BC

Top station integrated into an old building.
Tower 13 with night lighting.
Riding up the line.
Another view of the lift line.
Loading area and Poma Omega terminal.
The lift can be run at fixed-grip speed with a mid-load station at tower 8.
Poma half depress tower.
The breakover.
Arriving at the drive.
Unload ramp.
Midway loading not in use.
Split tower 7.
First few towers,
Poma Omega chair and grip.
Another view of the drive station.
Top station overview.

13 thoughts on “Screaming Eagle – Grouse Mountain, BC

  1. Milan S May 21, 2019 / 6:19 pm

    You know what, I hate this lift. Every time you go up to grouse on a busy day, you can expect 1 hour line ups on this lift. Grouse makes a ton of money so i dont get why they replace this thing with a 6 seater.

    Like

    • Donald Reif May 21, 2019 / 7:37 pm

      I think all they really need to do is add more chairs to bump the lift up to 2,800 pph.

      Liked by 2 people

      • MilanYVR August 7, 2019 / 10:46 pm

        Not at all. It needs to be a 6. This is the main chairlift for grouse. everyone goes to grouse just because they dont have to drive and lines can get worse then whistlers. I also think putting extensive upgrades on the chairlift would be a giant waste of money. The lift is decently old for a detach, and has seen better days. If you dont believe me about the lines, come to grouse and you will find out.

        Like

        • Kaden K (nedakalTNT) August 11, 2019 / 7:41 pm

          No it’s not. it’s made in 2000. That’s actually relatively new. They are at least going to get 10 more years, maybe more on this lift, and more chairs would help a lot. It doesn’t need to be six yet.

          Like

  2. milanyvr December 16, 2019 / 5:21 pm

    Since grouse is not getting enough snow this year to cover the entire cut, the screaming eagle mid station starts running tomorrow.

    Liked by 1 person

    • powderforever45 December 16, 2019 / 8:12 pm

      How slow do they run the lift then?

      Like

      • milanyvr December 17, 2019 / 10:26 pm

        Fixed Speed. I think 450 Linespeed.

        Like

        • Teddy's Lift World December 18, 2019 / 5:39 am

          Yesterday when I checked the webcam, I saw that it was running super slow. I was wondering why, but then I realized that it was running from the fixed mid. If and when this lift gets replaced, they should probably build a detachable mid-station.

          Like

        • Donald Reif February 12, 2020 / 6:07 pm

          Even something like this should’ve been done:

          Like

  3. John.U.26 February 12, 2020 / 11:29 am

    This lift is in really bad condition. You can’t really see it in pictures

    Like

    • milanyvr February 19, 2020 / 3:39 pm

      They recently replaced the top logo decal and removed the poma logo for whatever reason. I still think a 6 is the most practical since this lift has lines even at 10pm… But if you think about it more, it may be a bad investment due to climate change, especially with The Cut having snow problems since the 80s.

      Like

    • pbropetech September 29, 2021 / 12:24 pm

      Bad how?

      Like

  4. milanyvr February 19, 2020 / 3:46 pm

    Even with The Cut (The run under screaming eagle) having some of north americas biggest and oldest snowmaking, Once the temp is about 4 (metric) you cannot snowmake.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s