Leitner-Poma built four different lifts on Spruce Peak as part of its renewal between 2004 and 2006.Looking up at tower 2.The lower terminal and tower 1.Outside pedestal controls.90 degree loading.The lift line.Steep section.View down the lower part of the line.A depress assembly.Middle part of the lift.Another section of the line.The top/return terminal.View down from the summit.Breakover towers.The top station turnaround.Lift line seen from Toll House.
Sensation has 112 chairs on it.
LikeLike
LikeLike