Silver King – Whitewater, BC

The former Olive chair from Whistler Mountain was moved to Whitewater to replace a T-Bar.
The bottom terminal is a Yan model but with hydraulic tensioning added.
Top terminal with vault drive and Murray-Latta equipment.
View of the top station from below.
Upper secton of the lift line.
Steep lower section.
View down at T2.
Lower terminal and lift line.
Entire lift seen from Summit.
View back down the lift line.
Riblet insert clip.
Riding up the line.
Arriving at the drive.
Another view of the line.

16 thoughts on “Silver King – Whitewater, BC

  1. Misha Flynn's avatar Misha Flynn February 6, 2018 / 9:48 pm

    What year did this lift get it’s new Yan bottom terminal at Whistler?

    Like

    • Bog Laurel's avatar Bog Laurel February 23, 2024 / 5:36 pm

      September 1979 the Olive Chair was modified from Murray Latta to a Yan Typical. The bullwheel remained ML.

      Like

      • WH2Oshredder's avatar WH2Oshredder February 23, 2024 / 6:39 pm

        Yan also kept all the M-L sheaves on the bottom terminal

        Like

  2. Carson's avatar Carson May 6, 2018 / 9:34 am

    I would say 1991-1992 when the two high speed were put in

    Like

    • pbropetech's avatar pbropetech July 15, 2020 / 12:21 pm

      Most likely. When I rode it the season before it was removed I sorta recall a typical M-L terminal.

      Like

  3. WH2Oshredder's avatar WH2Oshredder January 13, 2024 / 8:45 pm

    Anybody knows the replacement timeline for this lift? Their 2019 Master Plan Addendum shows replacing it with a FGQ on the Raven alignment in 2027-2029 with a midstation for beginners, but with the Raven quad on that alignment it will probably stay in place for a little longer and when it’s time, they will probably consider a triple or quad as a replacement.

    Like

  4. magicwizard423's avatar magicwizard423 January 31, 2024 / 6:53 pm

    On the spreadsheets of Whistler and Silver King you say that the Olive Chair have been retired from Whistler in 1996 and reinstalled here in 1994. Are you sure that this is the former Olive Chair ? Could it be the Blue Chair, at Whistler, retired from Whistler n 1994 according to the Spreadsheet ?

    Like

    • WH2Oshredder's avatar WH2Oshredder February 5, 2024 / 2:54 pm

      This is the Olive chair, removed 1994 at Whistler

      Like

    • Bog Laurel's avatar Bog Laurel February 23, 2024 / 5:39 pm

      Silverking is the former Olive. It was installed at Whitewater in 1993.

      Like

  5. WH2Oshredder's avatar WH2Oshredder February 23, 2024 / 6:38 pm

    This lift has experienced another mechanical issue on February 15 with its backup drive and was closed for a few days. This is the 4th issue in two seasons, They will soon have to replace it

    Like

    • WH2Oshredder's avatar WH2Oshredder March 30, 2024 / 8:31 pm

      1993

      Like

    • Liam's avatar liam May 12, 2024 / 1:45 am

      They just have to make a green run connecter from the Raven Chair and then they can close it.

      Like

      • WH2Oshredder's avatar WH2Oshredder May 15, 2024 / 8:39 pm

        The Ymir Skiway acts like a connector, but it’s blue cause it’s icy and narrow with a lot of switchbacks.

        Like

  6. WH2Oshredder's avatar WH2Oshredder March 6, 2024 / 12:05 pm

    it has 126 chairs and 12 towers

    Like

  7. Nick's avatar Nick March 29, 2024 / 4:44 pm

    Is the chairlift replace in 1993 or 1994?

    Like

  8. WH2Oshredder's avatar WH2Oshredder March 30, 2024 / 8:31 pm

    Installed used in 1993.

    Like