As of 2018, there are three Snowdon lifts that run roughly parallel – a triple, quad and Poma platter. This is the triple.Lift line below the mid-station.Line above the mid-station.Leitner-Poma added an offload and tower in 2016.The mid.A buried lift line.Top vault drive.Side view of the top terminal.Last tower.View up from the base.Side view of the bottom station.Heron-Poma station.Counterweight tensioning.
Here’s the lower lift line before the infill tower was added:
And after:
Here’s Tower 12 before the midstation was put in:
LikeLike