This quad chair opened up an expansion area in 2007, although construction took longer than normal due to late payments to Leitner-Poma.Bottom terminal with an Alpha drive.Riding up the mellow lift line.View back down the lift line.Omega-style tower 7.Nearing the summit.Lift line overview.Fixed return bullwheel at the unload.Top station overview.View down the line from the summit.Looking down at T7.View up from near the base.Drive station light side.Bottom terminal side view.Grip and hanger.