This Doppelmayr detachable quad operates all winter and summer.It connects the Camelbeach waterpark with the summit lodge in summer.Return terminal.Uni model station.Unloading platform.Full chair parking rail.The drive station.Chair rail.Loading area.Side view of the drive terminal.Lift overview.The line.The lift crosses over several waterslides.Leaving the bottom terminal.Riding up.Combo assemblies.Tower 7.Breakover towers.Arriving at the return.View down from the summit.Doppelmayr EJ chair.
If this lift running during the summer. Does that mean this lift will have some high hours on it?
LikeLike
I assume this lift was scrapped after its removal?
LikeLike
I believe so, due to its age.
LikeLike