This quad opened in 1988 and effectively replaced a two lift ride from the base to summit.The top terminal and last towers.Return bullwheel and unloading area.View from the summit.Sheave assemblies integrated into the top terminal.Bottom terminal building.View up from the base.Loading area.Doppelmayr drive/tension station.Lower part of the lift line.Middle lift line.Just below the first offload ramp.Looking down from the middle station.Tower at the mid unload.Mid-station overview.Upper part of the lift line.