Sun Mountain Express – Bromley, VT

The base-to-summit Sun Mountain Express replaced a Riblet double in 1997.
Loading area and lift line.
Second generation Doppelmayr Uni bottom station.
View down the lift line.
Near the summit. The ski resort in the background is Stratton.
Tower 20 and the top terminal.
Top unload ramp with a little bit of ice on it.
Return terminal.
View down from the summit.
Middle section of the lift line.
View down the lower section of the line.
The bottom station seen from above.
Looking up line from the base area.
Parking rail for all the chairs used during storms.
The lower station seen from the side.
Another view of the bottom station.
Lift line seen from the parking lot.
Doppelmayr Worldbook entry.

3 thoughts on “Sun Mountain Express – Bromley, VT

  1. Mason Schade March 5, 2020 / 2:11 pm

    88 chairs

    Like

  2. skitheeast October 15, 2021 / 12:21 pm

    Bromley’s own website lists this lift’s capacity as 1800, not 2400

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s