T-Bar – Manning Park, BC

This T-Bar was the second lift built at Manning Park and the only Doppelmayr until 2019.
The top terminal has a counterweight for tensioning.
Tri-leg upper terminal.
View down the lift line.
Tower 3.
Towers 1 and 2.
A popular hiking trail crosses under the bottom of the lift so it gets buttoned up for the summers.
The diesel drive unit is located inside.

Leave a comment