Village Express – Snowmass, CO

img_8754
The Village Express and Sky Cab run parallel at the base of Snowmass.
img_8758
Bottom terminal at the new Snowmass Base Village.
img_8762
90-degree loading.
img_8769
Return seen from the Sky Cab.
img_8773
Very long lift line.
img_8818
Below the mid-station unload.
img_8819
First breakover.
img_8822
Half-mid for unloading.
img_8825
Upper lift line to Sam’s Knob.
img_8826
This lift is not very steep but has almost 3,000 vertical.
img_8833
Upper line.
img_8839
Nearing the top.
img_8843
Last three towers.
img_8923
Unloading ramp.
img_8925
Top station with drive equipment.
img_8928
Two breakovers.
img_8938
View down towards Snowmass.
img_8940
Above the mid-station.
img_8948
Half towers.
img_8952
Side view of the mid.
img_8955
Lower lift line.
img_8957
Another view of the mid-unload.
img_8977
Upper line next to Coney Glade.
img_8981
Half station.
img_8997
Tower 13.
img_8998
Another view of the lower line.
img_9085
Sam’s Knob from Big Burn.
img_9888
One more view of the unique first offload.

12 thoughts on “Village Express – Snowmass, CO

  1. Upper Dynamo's avatar Upper Dynamo May 2, 2018 / 2:18 pm

    Vertical is stated at 2,174 Capacity is 3,000 per hour FYI

    Like

  2. Donald M. Reif's avatar Donald M. Reif February 8, 2019 / 8:02 pm

    Chair count?

    Like

    • Ethan Parker's avatar Ethan Parker September 30, 2024 / 4:27 pm

      169

      Like

    • pbropetech's avatar pbropetech November 5, 2021 / 9:35 am

      That’s the snowmaking building, and 9A was added in a relative hurry during the initial load test. They dug the hole, formed it and poured the footer one day, then dropped the tower and anchored the comline the next. Apparently loaded carriers would drop almost to the roof during a stop.

      Like

      • psychic_legume's avatar psychic_legume February 3, 2023 / 5:58 pm

        Neither, actually, that building is the water treatment facility for Snowmass village. Source: worked there for a summer demo-ing new treatment methods

        Liked by 1 person

        • AO's avatar AO February 19, 2024 / 11:16 am

          The little building next to the pond is a micro hydro power plant

          Like

        • pbropetech's avatar pbropetech February 19, 2024 / 5:44 pm

          Copy that. My source was misinformed, apparently.

          Like

  3. snowbasin local's avatar 9412vcummins March 8, 2022 / 7:05 pm

    Video of the chairlift running on diesel. Video and audio is **** but hey the Detroit diesels sound really good.

    Liked by 1 person

  4. leander's avatar leander January 3, 2023 / 11:56 am

    for Donald M Reif, the chair count is 169(found out myself)

    Liked by 2 people

  5. SkiLucas's avatar SkiLucas March 1, 2024 / 6:45 am

    What are the clocks on the bottom terminal for?

    Like

    • Michael's avatar Michael March 1, 2024 / 8:03 am

      Only the one on the right is a clock. L to R- Summit temperature; Barometric pressure; Summit wind speed; Snowmass time of day. 👍

      Liked by 1 person

Leave a comment