This Doppelmayr triple indirectly replaced a shorter Hall double in 2016.Doppelmayr Tristar drive terminal.Side view of the bottom terminal.Lift overview.Lower part of the lift line.Riding up.The last tower and top terminal.Unloading ramp and small operator house.Fixed return bullwheel.View from the summit which is one of the highest points in the region.View down the line.Upper half of the lift.
is it just me or is this lift super slow for it’s size?
LikeLike