Willow Creek – Red Lodge Mountain, MT

IMG_5207
This terminal was initially located lower down next to the base lodge.
IMG_5211
Loading area.
IMG_5213
Looking up the line.
IMG_5235
View down the line.
IMG_5236
Middle part of the line.
IMG_5237
Upper lift line.
IMG_5251
Riblet vault drive and overhead unloading.
IMG_5252
Drive shaft and bullwheel.
IMG_5257
Upgraded controls from Superior Tramway.
IMG_5260
Classic Riblet towers.
IMG_5264
Top station overview.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.