I’m seeing a few lifts missing from the spreadsheet. The first lifts at Gorgoza were the former Rustler single chair from Alta and the t-bar from Solitude. I have confirmed with another source that there was a single chair at Gorgoza. From the interview documentation I found, It said that there was a Hall double that was less than 1000 feet long. The Hall double that is currently in the spreadsheet would probably have been the longer lift on the trail map I was able to find when the area reopened as Parley’s Summit. I would guess that the Hall double that was less than 1000 feet was the shorter lift on the map. It was mentioned in the interview that a chairlift was installed after Cal McPhie sold the area in 1968. It was also mentioned that the lift replaced the T-bar.
are you going to get over & out on this trip?
LikeLike
https://liftblog.com/over-and-out-park-city-ut/
LikeLike
I’m seeing a few lifts missing from the spreadsheet. The first lifts at Gorgoza were the former Rustler single chair from Alta and the t-bar from Solitude. I have confirmed with another source that there was a single chair at Gorgoza. From the interview documentation I found, It said that there was a Hall double that was less than 1000 feet long. The Hall double that is currently in the spreadsheet would probably have been the longer lift on the trail map I was able to find when the area reopened as Parley’s Summit. I would guess that the Hall double that was less than 1000 feet was the shorter lift on the map. It was mentioned in the interview that a chairlift was installed after Cal McPhie sold the area in 1968. It was also mentioned that the lift replaced the T-bar.
Trail Map:
Interview:
https://collections.lib.utah.edu/details?id=828335&q=Cal+McPhie
LikeLike