Top vault drive.Looking down from near the top.Looking down the light side.There used to be a midstation here.Top unloading ramp.Bottom tension station.
Riblet has always manufactured bail-type chairs. In the 60s and 70s, however, many resorts used center pole chairs (because they were cheaper I would guess). In 1985 or so, the design of their bail chairs changed from having vertical side tubes to having a slight bend in the middle.
Will is correct. All four of Crystal’s original Riblets had bails, not centre-poles. I miss old 4. This chair was so fun to run. Especially the top station on a nice sunny January day. Good view of East Peak.
I remember when Quarter Way, the mid-station, was removed. It was a mid unload and load station. The bottom terminal was moved uphill several hundred feet at the same time. This was sometime after Chair 8 went in. Chair 4’s bottom terminal was right next to 8’s in the base area and was an easy walk to get to.
I think it was when they installed 11, so likely 98. Also, they wouldn’t have had time to do it after you moved to Hamster Dumpster but before winter. I ran 4 in 99/00 and it was the shorter length/no Quarterway arrangement. It was a longer walk from the time clock than before, but easier than waiting for a sled ride from Shank or sitting on Chair 8.
Did they replace the chairs because I don’t recall Riblet making bail-type chairs in 1965
LikeLike
Riblet has always manufactured bail-type chairs. In the 60s and 70s, however, many resorts used center pole chairs (because they were cheaper I would guess). In 1985 or so, the design of their bail chairs changed from having vertical side tubes to having a slight bend in the middle.
LikeLiked by 1 person
Quite a number of Riblets with the post 1985 design are actually center-poles that have been retrofitted.
LikeLike
Will is correct. All four of Crystal’s original Riblets had bails, not centre-poles. I miss old 4. This chair was so fun to run. Especially the top station on a nice sunny January day. Good view of East Peak.
LikeLike
I remember when Quarter Way, the mid-station, was removed. It was a mid unload and load station. The bottom terminal was moved uphill several hundred feet at the same time. This was sometime after Chair 8 went in. Chair 4’s bottom terminal was right next to 8’s in the base area and was an easy walk to get to.
LikeLike
It was a long time after 8 went in. That was ’84, and 4 wasn’t shortened until after I left there, so at least ’97.
LikeLike
I think it was when they installed 11, so likely 98. Also, they wouldn’t have had time to do it after you moved to Hamster Dumpster but before winter. I ran 4 in 99/00 and it was the shorter length/no Quarterway arrangement. It was a longer walk from the time clock than before, but easier than waiting for a sled ride from Shank or sitting on Chair 8.
LikeLike
if this lift was built in 1965, why does it have older towers? those ended in 1964
LikeLike
Left over stock? Equipment purchased sooner than it was installed? Several possibilities.
LikeLike